Certificate of compliance of the constructed reconstructed object.

DEPARTMENT OF CONSTRUCTION AND ARCHITECTURE

ORDER

ABOUT THE FORM OF DOCUMENTS ATTACHED TO THE APPLICATION FOR ISSUANCE OF PERMISSION TO COMMISSION A FACILITY

(as amended by the orders of the Department of Construction and Architecture of the Administration of the Vladimir Region dated May 29, 2009 N 51-a, dated May 17, 2010 N 41-a, dated November 8, 2012 N 106/1)

In order to establish uniform requirements for the form of documents attached by the developer to the application for a permit to put a facility into operation in accordance with Article 55 of the Town Planning Code of the Russian Federation,

I order:

1. Approve document forms:

1.1. On compliance of the parameters of the constructed, reconstructed, repaired capital construction facility with the requirements of the design documentation in accordance with Appendix No. 1.

1.2. On the compliance of the constructed, reconstructed, repaired capital construction facility with the requirements of technical regulations in accordance with Appendix No. 2.

1.3. On the compliance of the constructed, reconstructed, repaired capital construction facility with technical conditions in accordance with Appendix No. 3.

1.4. On compliance of the parameters of the constructed or reconstructed linear facility with the requirements of design documentation in accordance with Appendix No. 4.

1.5. On the compliance of the constructed or reconstructed linear facility with the requirements of technical regulations in accordance with Appendix No. 5.

1.6. Certificate of acceptance into operation of a completed construction facility in accordance with Appendix No. 6.

(clause 1.6 was introduced by order of the Department of Construction and Architecture of the Vladimir Region Administration dated May 29, 2009 N 51-a)

2. Department of Architecture and Urban Planning:

Administration of the Vladimir region dated May 17, 2010 N 41-a)

2.1. Be guided by paragraph 1 of this order when checking the availability and correctness of the documents attached by the developer to the application for permission to put objects into operation, if the issuance of permits to put objects into operation is within the competence of the department of construction and architecture of the regional administration by current legislation.

2.2. Within ten days from the date of signing this order, send a copy of it to the local government authorities that issue permits for putting objects into operation.

2.3. Place the annexes to this order on the official website of the Department of Construction and Architecture of the Regional Administration on the Internet.

(clause 2.3 was introduced by order of the Department of Construction and Architecture of the Administration of the Vladimir Region dated May 29, 2009 N 51-a)

3. Recommend that local government bodies be guided by paragraph 1 of this order when checking the availability and correctness of the documents attached by the developer to the application for permission to put objects into operation.

4. Entrust control over the implementation of this order to the deputy director of the department, the chief architect of the region.

Department Director
construction and architecture
S.A.BOKOV

Appendix No. 1. DOCUMENT on compliance of the parameters of the constructed, reconstructed, repaired capital construction facility with the requirements of the design documentation

Appendix No. 1
to the department order
construction and architecture
administration of the Vladimir region
dated March 13, 2007 N 37

(as amended by the order of the Department of Construction and Architecture
administration of the Vladimir region dated May 17, 2010 N 41-a)

DOCUMENT on compliance of the parameters of the constructed, reconstructed, repaired capital construction facility with the requirements of the design documentation

Object location ___________________________________________________.

___________________________________________________________________________

Conclusion of the state examination on design documentation****

N _____________________________ from "____" _______________ _______ issued

___________________________________________________________________________
(name of the organization that conducted the state examination of the design
documentation)

List of buildings and structures included in the facility

Name of the building, structure

Type of work (new construction, reconstruction, major repairs)

Parameter name

Unit

Built object

Total area of ​​the object

Number of floors above ground

Number of underground floors

Construction volume, incl. underground part

Height of above-ground floors

Height of underground floors

Marking the depth of the underground part

Height of the object, mark of the highest point of the building, structure

Spacing of load-bearing walls, columns

Building area

Other parameters

Types of engineering support for the facility:

1. Internal engineering equipment

Name

Built object

Electricity supply

Water supply

Gas supply

Heating

Water disposal

Ventilation

2. External networks

Length, m

According to approved design documentation

Built object

Electricity supply

Water supply

Gas supply

Heat supply

Water disposal

Designs and materials

Structural element

Design solution and material

according to approved design documentation

built object

Foundations

Exterior walls

Internal walls, partitions

Floors

Main indicators of facility capacity ***

Indicator name

According to approved design documentation

Built object

Number of sections

Number of apartments, incl.
1-room;
2-room;
3-room;
4 or more rooms

Number of workplaces

Performance

Capacity

Other indicators:

Facility energy efficiency indicators

Indicator name

Normative value

Actual value

specific value of energy resource consumption, including:

Thermal energy, Gcal

Electrical energy, kW

Gas, cubic meters m

Availability of metering devices, including:

Thermal energy, Gcal

Electrical energy, kW

Gas, cubic meters m

Other indicators:

Parameters of the constructed, reconstructed, repaired facility
capital construction (cross out what is not necessary) __________________________
________________________________________________________________________
(name and location of the object *)

comply with the approved design documentation, including the requirements
energy efficiency and equipment requirements for the facility
accounting of used energy resources.

The placement of objects on the land plot corresponds to the scheme
planning organization of the land plot, approved as part of
project documentation.

_______________________________________________ __________ ________________

"_____" _____________ 200__

M.p.
______________________________________ __________ ________________
(position of responsible representative (signature) (full name)
customer or developer)

"_____" _____________ 20__

________________


approved project.

*** The power indicators of an object are indicated depending on its
appointments.

**** In case, in accordance with urban planning
legislation, carrying out state examination of design
documentation is not required, the words “not required” are entered in the column.

Appendix No. 2. DOCUMENT on the compliance of the constructed, reconstructed, repaired capital construction facility with the requirements of technical regulations

Appendix No. 2
to the department order
construction and architecture
administration of the Vladimir region
dated March 13, 2007 N 37


Name of the property * ________________________________________________________

___________________________________________________________________________

Developer ________________________________________________________________
(name of organization, full name of individual)

Customer __________________________________________________________________

Project documentation developed _____________________________________________

___________________________________________________________________________
(name of design organization)

Construction was carried out:

General construction contractor ________________________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

Main characteristics of the constructed, reconstructed,
renovated object:

Total area of ​​the facility, sq. m ________________________________________________

Construction volume, cubic meters m _____________, incl. underground part __________

Number of floors above ground ___________________, underground ________________

Height of above ground floors _________________ m, underground floors _______________ m

Height of the object (roof ridge mark), m __________________________________

List of constructed (reconstructed) auxiliary facilities
appointments ________________________________________________________________

___________________________________________________________________________
(garage, boiler room, transformer substation, hydraulic fracturing, etc.)

Construction area of ​​the building (buildings), sq. m __________________________________

Types of engineering support for the facility: _____________________________________

___________________________________________________________________________

water supply, sewerage, electricity, gas supply, heat supply,

___________________________________________________________________________
communication, centralized or individual

Built (reconstructed, repaired) capital facility

construction ______________________________________________________________
___________________________________________________________________________
(Object name *)

and its placement on the land plot complies with technical requirements
regulations.


(position of the person carrying out construction) (signature) (full name)

"___" ____________ 200__

________________


project.

Appendix No. 3. DOCUMENT on the compliance of the constructed, reconstructed, repaired facility with technical specifications

Appendix No. 3
to the department order
construction and architecture
administration of the Vladimir region
dated March 13, 2007 N 37

on ________________________________________________________________________
(name of type of engineering support: water supply,
power supply, etc.)

An object: ___________________________________________________________________

___________________________________________________________________________

Address of the object _____________________________________________________________

Developer (Customer) _____________________________________________________
(name of organization, full name of individual)

___________________________________________________________________________

Construction (reconstruction, major repairs) was carried out in

in accordance with technical specifications No. _____________ dated _________________,

issued by _________________________________________________________________

___________________________________________________________________________
(name of the organization that issued the specifications)

Project documentation developed _____________________________________________

___________________________________________________________________________
(name of the person who completed the corresponding section of the project)

___________________________________________________________________________

The work was carried out ______________________________________________________________

___________________________________________________________________________
(name of the organization that performed the corresponding type of work)

Conclusion:

As a result of the inspection of the object ______________________________________________

___________________________________________________________________________
(name of the object in accordance with the approved project)
it was established that the work was completed in full in accordance with
technical conditions and allow you to ensure uninterrupted and safe
operation of the facility that meets current requirements

normative and technical documents, technical regulations.

___________________________________________________________________________
(name of engineering networks and structures)

accepted in accordance with the procedure established by law for balance, maintenance

___________________________________________________________________________
(name of the organization that accepted the network for balance or service)

________________________________________ __________ _____________________

operating organization) (signature) (full name)

"___" ________________ 200__

Appendix No. 4. DOCUMENT on compliance of the parameters of the constructed or reconstructed linear object with the requirements of the design documentation

Appendix No. 4
to the department order
construction and architecture
administration of the Vladimir region
dated March 13, 2007 N 37

Name of the property * ________________________________________________________

___________________________________________________________________________

Address of the object _____________________________________________________________

Developer ________________________________________________________________
(name of organization, full name of individual)

Customer __________________________________________________________________

Project documentation developed _____________________________________________

The conclusion of the state examination on the design documentation was issued

___________________________________________________________________________
(name of the body for state examination of design documentation)

___________________________ "___" ______________ ___ year N _______________

Construction was carried out ** _________________________________________________

based on the agreement dated "___" _______________ 20_____ N _____________________


(cross out what is not necessary)

Main parameters of the construction site

Parameter name

Unit

According to the statement project documentation

Built object

Total length

Power (pressure, voltage, throughput, category, etc.)

For pipelines:

Laying method
(ground, aboveground, underground)

Pipe diameter

Gasket height
(with above-ground method)

Laying depth
(for underground installation)

Material
Pipes
Support (for above-ground installation)

For roads:

Width of the road within the right of way

Lane (track) width

Number of lanes

Design speed

Parameters of the constructed (reconstructed) linear object

___________________________________________________________________________
(Object name*)

___________________________________________________________________________
comply with approved design documentation

The placement of a linear object on a land plot corresponds to the diagram
its placement, approved as part of the design documentation.

_______________________________________________ _________ _______________
(position of the person carrying out construction) (signature) (full name)

_______________________________________________ _________ _______________
(position, responsible representative
Customer or developer) (signature) (full name)

"___" _____________ 200__

For roads:

Lane (track) width, m ___________, number of lanes _______

__________________________________________________________________________
(Object name *)

___________________________________ ___________ ____________________

construction)

"___" _____________ 200__

________________

* The name of the object is indicated in exact accordance with the approved
project.

** The name of the general contractor is indicated.

Appendix No. 5. DOCUMENT on the compliance of the constructed or reconstructed linear facility with the requirements of technical regulations

Appendix No. 5
to the department order
construction and architecture
administration of the Vladimir region
dated March 13, 2007 N 37


Name of the property * ________________________________________________________

___________________________________________________________________________

Address of the object _____________________________________________________________

Developer ________________________________________________________________
(name of organization, full name of individual)

Customer __________________________________________________________________

Project documentation developed _____________________________________________

___________________________________________________________________________

Construction was carried out (general construction contractor)

___________________________________________________________________________

Construction characteristics: new construction, reconstruction
(cross out what is not necessary)

Main parameters of the constructed (reconstructed) facility:

Total length, m _____________________________________________________

Power (pressure, voltage, throughput, category, etc.)__

___________________________________________________________________________

For pipelines:

Pipe diameter ______________________________________________________________

Laying method: above ground, above ground, underground (cross out what is not necessary)

Laying height for above-ground method, m __________________, support material

Or pipe laying depth, m _______________

For roads:

Total width of the road within the right of way, m ___________________________

Lane (track) width, m _______, number of lanes ___________

Estimated speed, km/h __________________________________________

Constructed (reconstructed) linear object

___________________________________________________________________________
(Object name *)

___________________________________________________________________________
complies with the requirements of technical regulations.

________________________________________ ___________ __________________
(position, full name of the person carrying out (signature) (full name)
construction)

"___" _______________ 200__

________________

* The name of the object is indicated in exact accordance with
approved project.

Appendix No. 6. Certificate of acceptance into operation of a completed facility

Appendix No. 6
to the department order
construction and architecture
administration of the Vladimir region
dated March 13, 2007 N 37

(as amended by the order of the Department of Construction and Architecture
administration of the Vladimir region dated 08.11.2012 N 106/1)

Certificate of acceptance into operation of a completed facility


Compiled by "____" ____________ 20__

Contains:

Customer representative(s) ________________________________________________
(full name, position)

___________________________________________________________________________

Contractor representative(s) ________________________________________________
(full name, position)

___________________________________________________________________________

Subcontractor representative(s) _________________________________________________
(full name, position)

___________________________________________________________________________

INSTALLED:

The contractor presented the object to the commission for acceptance: __________________

___________________________________________________________________________

Name of the property *

___________________________________________________________________________

located at: __________________________________________________

2. Construction was carried out in accordance with the permit
construction No. ________________, issued by "___" ________ 20__ _________

___________________________________________________________________________
(name of the authorized body that issued the construction permit)

3. Construction was carried out by:

General contractor _____________________________________________________
(name of organization, legal address)

___________________________________________________________________________
(information about the availability of SRO approval)

Subcontractors ___________________________________________________
(name of organizations and their legal address)

___________________________________________________________________________

___________________________________________________________________________

4. Project documentation developed _____________________________________

___________________________________________________________________________
(name of organizations and their legal address, information on availability

SRO approval)

4.1. Project documentation was approved** based on positive
conclusion of the state examination dated "__" ______ 20__ N ____________
State Environmental Expertise N ______ dated "___" ________ 20__

5. Construction and installation work was carried out within the following terms:

beginning of work ________________
(month year)

completion of work ________________
(month year)

6. The object presented by the Contractor for delivery meets the requirements
power and characteristics established in the design documentation, work
performed in accordance with the contract (agreement).

DECISION OF THE ADMISSION COMMISSION:

Object presented for acceptance:

___________________________________________________________________________
(name of the property*)

___________________________________________________________________________

___________________________________________________________________________
(object location)

performed in accordance with the project, the requirements of technical regulations,
prepared for commissioning and accepted by the acceptance committee.

Signatures of the commission members***:

__________ ____________________ _____________________
(position) (signature) (full name)

____________ ____________________ _____________________
(position) (signature) (full name)

Note:

* The name of the object is indicated in exact accordance with the approved
project.

** In case, in accordance with urban planning legislation
carrying out state examination of design documentation,
state environmental impact assessment is not required, enter in the column
the words "not required".

*** The signatures of commission members - legal entities are certified by a seal.

2. To put the facility into operation, the developer applies to the federal executive body, the executive body of the constituent entity of the Russian Federation, the local government body, the State Atomic Energy Corporation Rosatom or the State Corporation for Space Activities Roscosmos, which issued the construction permit, directly or through a multifunctional center with an application for permission to put the facility into operation. Developers whose names contain the words “specialized developer” can also apply with the specified application using the unified housing construction information system, except for cases where, in accordance with the regulatory legal act of a constituent entity of the Russian Federation, the issuance of a permit to put a facility into operation is carried out through other information systems that must be integrated with a unified housing construction information system.

ConsultantPlus: note.

Documents provided for in clause 13, part 3, art. 55 (in the previously valid version), submitted before 08/04/2018 along with an application for a permit to put an object into operation, are an annex to the permit, and the permit itself is a decision to establish a security zone.

3. To make a decision on issuing a permit to put a facility into operation, the following documents are required:

1) documents of title to the land plot, including an agreement on the establishment of an easement, a decision on the establishment of a public easement;

(see text in the previous edition)

2) an urban planning plan of a land plot, submitted to obtain a building permit, or in the case of construction, reconstruction of a linear object, a territory planning project and a territory surveying project (except for cases in which the preparation of territory planning documentation is not required for the construction or reconstruction of a linear object) , a territory planning project in the event of issuing a permit for the commissioning of a linear facility, the placement of which does not require the formation of a land plot;

(see text in the previous edition)

3) construction permit;

4) act of acceptance of a capital construction project (in the case of construction or reconstruction on the basis of a construction contract);

(see text in the previous edition)

(see text in the previous edition)

6) an act confirming the compliance of the parameters of the constructed or reconstructed capital construction project with design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction project with metering devices for energy resources used, and signed by the person carrying out the construction (the person carrying out the construction and the developer or technical the customer in the case of construction, reconstruction on the basis of a construction contract, as well as the person exercising construction control in the case of construction control on the basis of a contract);

(see text in the previous edition)

7) documents confirming the compliance of the constructed or reconstructed capital construction facility with technical conditions and signed by representatives of organizations operating engineering support networks (if any);

(see text in the previous edition)

8) a diagram showing the location of the constructed or reconstructed capital construction project, the location of engineering and technical support networks within the boundaries of the land plot and the planning organization of the land plot and signed by the person carrying out the construction (the person carrying out the construction and the developer or technical customer in the case of construction, reconstruction on the basis of a construction contract), with the exception of cases of construction or reconstruction of a linear facility;

(see text in the previous edition)

9) conclusion of the state construction supervision body (if state construction supervision is provided in accordance with Part 1 of Article 54 of this Code) on the compliance of the constructed or reconstructed capital construction facility with the requirements of design documentation (including design documentation that takes into account changes made to in accordance with parts 3.8 and 3.9 of Article 49 of this Code), including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used, the conclusion of the federal executive body authorized to carry out federal state environmental supervision (hereinafter referred to as the federal state environmental supervision body ), issued in the cases provided for in Part 7 of Article 54 of this Code;

(see text in the previous edition)

10) a document confirming the conclusion of an agreement on compulsory insurance of civil liability of the owner of a hazardous facility for harm caused by an accident at a dangerous facility in accordance with the legislation of the Russian Federation on compulsory insurance of civil liability of the owner of a dangerous facility for harm resulting from an accident at a hazardous facility;

11) act of acceptance of work performed to preserve a cultural heritage object, approved by the relevant body for the protection of cultural heritage objects, defined by Federal Law of June 25, 2002 N 73-FZ "On objects of cultural heritage (historical and cultural monuments) of the peoples of the Russian Federation", when carrying out restoration, conservation, repair of this object and its adaptation for modern use;

12) technical plan of a capital construction project, prepared in accordance with Federal Law of July 13, 2015 N 218-FZ “On State Registration of Real Estate”;

(see text in the previous edition)

(see text in the previous edition)

(see text in the previous edition)

3.1. The document and conclusion specified in paragraphs 6 and 9 of part 3 of this article must contain information on the standard values ​​of the indicators included in the requirements for the energy efficiency of a capital construction project, and on the actual values ​​of such indicators determined in relation to the constructed, reconstructed capital construction project as a result of carried out research, measurements, examinations, tests, as well as other information on the basis of which the compliance of such an object with energy efficiency requirements and the requirements for its equipment with metering devices for energy resources used is established. During the construction or reconstruction of an apartment building, the conclusion of the state construction supervision body must also contain information about the energy efficiency class of the apartment building, determined in accordance with the legislation on energy saving and increasing energy efficiency.

(see text in the previous edition)

3.2. Documents (their copies or information contained in them) specified in paragraphs 1, , and 9 of part 3 of this article are requested by the bodies specified in part 2 of this article, in state bodies, local government bodies and subordinate state bodies or local government bodies organizations that have the specified documents at their disposal, if the developer has not submitted the specified documents independently.

3.3. The documents specified in paragraphs 1, , , and 8 of part 3 of this article are sent by the applicant independently if these documents (their copies or information contained in them) are not at the disposal of state authorities, local governments or subordinate state authorities or bodies local government organizations. If the documents specified in this part are at the disposal of state authorities, local self-government bodies or organizations subordinate to state authorities or local self-government bodies, such documents are requested by the body specified in part 2 of this article, from the bodies and organizations at the disposal of the specified documents, if the developer has not submitted these documents independently.

(see text in the previous edition)

3.4. At the interdepartmental requests of the bodies specified in part 2 of this article, documents (their copies or information contained in them) provided for in part 3 of this article are provided by state bodies, local government bodies and organizations subordinate to state bodies or local government bodies, at whose disposal these documents are located no later than three working days from the date of receipt of the relevant interdepartmental request.

4. The Government of the Russian Federation may establish, in addition to those provided for in Part 3 of this article, other documents necessary to obtain permission to put a facility into operation, in order to obtain in full the information necessary to register a capital construction project with state registration.

4.1. To obtain permission to put a facility into operation, it is permitted to require only the documents specified in parts 3 and this article. The documents provided for in parts 3 and this article may be sent in electronic form. The Government of the Russian Federation or the highest executive body of state power of a constituent entity of the Russian Federation (in relation to cases of issuing permission to put an object into operation by executive authorities of constituent entities of the Russian Federation, local government bodies) may establish cases in which the sending of the documents specified in parts 3 and this article and the issuance of commissioning permits is carried out exclusively in electronic form. The procedure for sending the documents specified in parts 3 and this article to the federal executive authorities authorized to issue permits for putting a facility into operation, executive authorities of a constituent entity of the Russian Federation, local government bodies, the State Atomic Energy Corporation "Rosatom" or the State Corporation for space activities of Roscosmos in electronic form is established by the Government of the Russian Federation.

(see text in the previous edition)

5. The authority, the State Atomic Energy Corporation "Rosatom" or the State Corporation for Space Activities "Roscosmos", which issued the construction permit, within seven working days from the date of receipt of the application for permission to put the facility into operation, is obliged to ensure the availability and correctness of execution of the documents specified in part 3 of this article, inspection of the capital construction project and issue the applicant with permission to put the facility into operation or refuse to issue such permission, indicating the reasons for the refusal. During the inspection of a constructed or reconstructed capital construction project, the compliance of such an object with the requirements specified in the construction permit, the requirements for construction, reconstruction of a capital construction project established on the date of issue of the urban planning plan of the land plot submitted for obtaining a construction permit, or in the case of construction , reconstruction of a linear object to the requirements of the territory planning project and the territory surveying project (except for cases in which the construction or reconstruction of a linear object does not require the preparation of territory planning documentation), the requirements established by the territory planning project, in the case of issuing permission to put into operation a linear object, for the placement of which the formation of a land plot is not required, as well as the permitted use of the land plot, restrictions established in accordance with land and other legislation of the Russian Federation, the requirements of project documentation, including energy efficiency requirements and the requirements for equipping a capital construction facility with metering devices used energy resources. If during the construction or reconstruction of a capital construction project state construction supervision is carried out in accordance with Part 1 of Article 54 of this Code, an inspection of such a facility by the body that issued the construction permit is not carried out.

(see text in the previous edition)

6. The grounds for refusal to issue a permit to put an object into operation are:

(see text in the previous edition)

(see text in the previous edition)

2) non-compliance of the capital construction project with the requirements for construction, reconstruction of a capital construction project established on the date of issue of the urban planning plan of the land plot submitted for obtaining a construction permit, or in the case of construction, reconstruction, major repairs of a linear facility with the requirements of the territory planning project and the territory surveying project ( with the exception of cases in which the construction or reconstruction of a linear facility does not require the preparation of territory planning documentation), the requirements established by the territory planning project, in the case of issuing a permit for the commissioning of a linear facility, the placement of which does not require the formation of a land plot;

(see text in the previous edition)

3) non-compliance of the capital construction project with the requirements established in the construction permit;

4) discrepancy between the parameters of the constructed or reconstructed capital construction facility and the design documentation;

(see text in the previous edition)

5) non-compliance of the capital construction project with the permitted use of the land plot and (or) restrictions established in accordance with land and other legislation of the Russian Federation on the date of issuance of permission to put the facility into operation, except for cases where these restrictions are provided for by the decision to establish or change the zone with special conditions for the use of the territory, adopted in the cases provided for in paragraph 9 of part 7 of Article 51 of this Code, and the capital construction facility under construction or reconstruction, in connection with the location of which a zone with special conditions for the use of the territory has been established or changed, has not been put into operation.

(see text in the previous edition)

6.1. Failure to receive (untimely receipt) of documents requested in accordance with parts 3.2 and 3.3 of this article cannot be grounds for refusal to issue permission to put a facility into operation.

(see text in the previous edition)

8. Refusal to issue a permit to put a facility into operation may be challenged in court.

(see text in the previous edition)

9. A permit to put a facility into operation (except for a linear facility) is issued to the developer if the federal executive body, the executive body of the constituent entity of the Russian Federation, the local government body, the State Atomic Energy Corporation Rosatom or the State Space Corporation activities of Roscosmos, which issued the construction permit, were given a free copy of the diagram showing the location of the constructed, reconstructed capital construction facility, the location of engineering and technical support networks within the boundaries of the land plot and the planning organization of the land plot, for placement of such a copy in the state information system for providing urban planning activities.

(see text in the previous edition)

9.1. Federal executive body, executive body of a constituent entity of the Russian Federation, local government body, State Atomic Energy Corporation "Rosatom" or State Corporation for Space Activities "Roscosmos", which issued permission to put the facility into operation, within five working days from the date of issue such permission is ensured (including using a unified system of interdepartmental electronic interaction and regional systems of interdepartmental electronic interaction connected to it) transfer to the state authorities of the constituent entities of the Russian Federation, local government bodies of municipal districts, urban districts information, documents, materials specified in paragraphs 3, - 9.2, and 12 of part 5 of article 56 of this Code.

10. Permission to put a facility into operation is the basis for registering a constructed capital construction facility with the state, making changes to the state registration documents of a reconstructed capital construction facility.

10.1. A mandatory annex to the permit to put the facility into operation is the technical plan of the capital construction project submitted by the applicant, prepared in accordance with Federal Law of July 13, 2015 N 218-FZ “On State Registration of Real Estate”.

(see text in the previous edition)

(see text in the previous edition)

11. The permit to put a facility into operation must reflect information about the capital construction facility to the extent necessary for its state cadastral registration. The composition of such information must comply with the requirements established in accordance with the Federal Law of July 13, 2015 N 218-FZ "On State Registration of Real Estate" for the composition of information in the graphic and text parts of the technical plan.

(see text in the previous edition)

11.1. After completion of the construction of a capital construction project, the person carrying out the construction is obliged to transfer to the developer of such a project the results of engineering surveys, design documentation, inspection reports of work, structures, sections of engineering support networks for the capital construction project, and other documentation necessary for the operation of such a facility.

11.2. When carrying out work to preserve a cultural heritage site, permission to commission such a facility is issued taking into account the specifics established by the legislation of the Russian Federation on the protection of cultural heritage sites.

12. The form of permission to put a facility into operation is established by the federal executive body authorized by the Government of the Russian Federation.

(see text in the previous edition)

13. Within three working days from the date of issuance of the permit to put the facility into operation, the body that issued such permit shall send a copy of such permit to the federal executive body authorized to carry out state construction supervision, if a permit to put the facility into operation has been issued capital construction specified in paragraph 5.1 of Article 6 of this Code, or to the executive body of the constituent entity of the Russian Federation authorized to carry out state construction supervision, if permission has been issued for the commissioning of other capital construction projects.

(see text in the previous edition)

14. In the cases provided for in paragraph 9 of part 7 of Article 51 of this Code, within three working days from the date of issuance of permission to put the facility into operation, the federal executive body, the executive body of the constituent entity of the Russian Federation, the local government body, the State Atomic Energy Corporation Rosatom or the State Corporation for Space Activities Roscosmos, which issued such a permit, sends (including using the unified system of interdepartmental electronic interaction and regional systems of interdepartmental electronic interaction connected to it) a copy of such permission to state authorities or local governments who have made a decision to establish or change a zone with special conditions for the use of the territory in connection with the location of an object for which permission to put the object into operation has been issued.

ConsultantPlus: note.

Obtaining permission to put a facility into operation is also not required in the cases specified in Art. 16 Federal Law dated August 3, 2018 N 340-FZ.

15. A permit to put a facility into operation is not required if, in accordance with Part 17 of Article 51 of this Code, the construction or reconstruction of a facility does not require the issuance of a construction permit.

16. In the case of construction or reconstruction of an individual housing construction project or garden house, the developer, no later than one month from the date of completion of construction or reconstruction of an individual housing construction project or garden house, submits a paper copy through a personal appeal to the federal body authorized to issue construction permits executive power, an executive body of a constituent entity of the Russian Federation or a local government body, including through a multifunctional center, or sends to these bodies by mail with acknowledgment of delivery or a single portal of state and municipal services a notification of the completion of construction or reconstruction of an individual housing construction project or garden house (hereinafter referred to as the notice of completion of construction). The notice of completion of construction must contain the information provided for in paragraphs 1 - , and 8 of part 1 of Article 51.1 of this Code, as well as information about the parameters of the constructed or reconstructed individual housing construction project or garden house, about payment of the state fee for state registration of rights, about the method sending to the developer the notification provided for in paragraph 5 of part 19 of this article. The following is attached to the notice of completion of construction:

2) technical plan of an individual housing construction project or garden house;

3) an agreement concluded between the legal holders of a land plot to determine their shares in the right of common shared ownership of a built or reconstructed individual housing construction project or garden house in the event that the land plot on which the individual housing construction project or garden house is built or reconstructed belongs to two and more citizens on the right of common shared ownership or on the right of lease with a plurality of persons on the tenant’s side.

17. If the notice of completion of construction does not contain the information provided for in paragraph one of part 16 of this article, or the absence of documents attached to it and provided for in paragraphs 1 - 3 of part 16 of this article, as well as if the notice of completion of construction was received after the expiration of ten years from the date of receipt of the notice of planned construction, in accordance with which the construction or reconstruction of an individual housing construction project or garden house was carried out, or a notification of the planned construction of such an individual housing construction project or garden house was not previously sent (including it was returned to the developer in accordance with Part 6 of Article 51.1 of this Code), authorized to issue construction permits, the federal executive body, the executive body of the constituent entity of the Russian Federation or the local government body, within three working days from the date of receipt of the notice of completion of construction, returns the notice of completion of construction to the developer and the documents attached to it without consideration, indicating the reasons for the return. In this case, the notification of completion of construction is considered unsent.

18. The form of notification of the completion of construction is approved by the federal executive body exercising the functions of developing and implementing state policy and legal regulation in the field of construction, architecture, and urban planning.

19. The federal executive body, executive body of a constituent entity of the Russian Federation or local government authorized to issue construction permits, within seven working days from the date of receipt of the notification of completion of construction:

1) checks the compliance of the parameters of the constructed or reconstructed individual housing construction project or garden house specified in the notice of completion of construction with the maximum parameters of permitted construction, reconstruction of capital construction projects, established by the rules of land use and development, and territory planning documentation, in force on the date of receipt of the notice of planned construction , and mandatory requirements for the parameters of capital construction projects established by this Code, other federal laws (including if the specified limit parameters or mandatory requirements for the parameters of capital construction projects are changed after the day the notification of planned construction and notification of the completion of construction confirms the compliance of the parameters of the constructed or reconstructed individual housing construction project or garden house with the maximum parameters and mandatory requirements for the parameters of capital construction projects in force on the date of receipt of the notification of the planned construction). If the notice of completion of construction confirms the compliance of the parameters of the constructed or reconstructed individual housing construction object or garden house with the maximum parameters and mandatory requirements for the parameters of capital construction objects in force on the date of receipt of the notice of completion of construction, the compliance of the parameters of the constructed or reconstructed individual object is checked housing construction or garden house to the specified limit parameters and mandatory requirements for the parameters of capital construction projects in force on the date of receipt of the notice of completion of construction;

2) checks, by inspecting an individual housing construction project or garden house, that the external appearance of an individual housing construction project or garden house corresponds to the description of the appearance of such an object or house, which is an appendix to the notice of planned construction (provided that the developer, within the period specified in paragraph 3 of part 8 of Article 51.1 of this Code, no notification was sent about the discrepancy between the parameters of an individual housing construction project or a garden house specified in the notice of planned construction with the established parameters and (or) the inadmissibility of placing an individual housing construction project or a garden house on a land plot on the basis specified in paragraph 4 Part 10 of Article 51.1 of this Code), or a standard architectural solution specified in the notice of planned construction, in the case of construction or reconstruction of an individual housing construction project or garden house within the boundaries of a historical settlement of federal or regional significance;

3) checks the compliance of the type of permitted use of an individual housing construction project or garden house with the type of permitted use specified in the notice of planned construction;

4) checks the admissibility of placing an individual housing construction project or garden house in accordance with the restrictions established in accordance with the land and other legislation of the Russian Federation on the date of receipt of the notification of completion of construction, except for cases where these restrictions are provided for by the decision to establish or change the zone with special conditions for the use of the territory adopted in relation to the planned construction, reconstruction of a capital construction project and such a capital construction project has not been put into operation;

5) sends to the developer, in the manner specified in the notice of completion of construction, a notification about the compliance of the constructed or reconstructed individual housing construction object or garden house with the requirements of the legislation on urban planning activities or about the non-compliance of the constructed or reconstructed individual housing construction object or garden house with the requirements of the legislation on urban planning activity with indicating all the grounds for sending such notification. Forms of notification about the compliance of a built or reconstructed individual housing construction project or garden house with the requirements of the legislation on urban planning activities, notifications about the non-compliance of a built or reconstructed individual housing construction project or a garden house with the requirements of the legislation on urban planning activities are approved by the federal executive body exercising the functions of development and implementation state policy and legal regulation in the field of construction, architecture, urban planning.

20. Notification of non-compliance of constructed or reconstructed individual housing construction projects or garden houses with the requirements of the legislation on urban planning activities is sent only in the following cases:

1) the parameters of the constructed or reconstructed individual housing construction project or garden house do not comply with the maximum parameters of permitted construction, reconstruction of capital construction projects specified in paragraph 1 of part 19 of this article, established by the rules of land use and development, territory planning documentation, or mandatory requirements for the parameters of objects capital construction established by this Code and other federal laws;

2) the external appearance of an individual housing construction object or garden house does not correspond to the description of the external appearance of such an object or house, which is an appendix to the notice of planned construction, or the standard architectural solution specified in the notice of planned construction, or the developer was sent a notice of non-compliance specified in notification of the planned construction of the parameters of an individual housing construction project or a garden house, the established parameters and (or) the inadmissibility of placing an individual housing construction project or a garden house on a land plot on the basis specified in paragraph 4 of part 10 of Article 51.1 of this Code, in the case of construction or reconstruction of the facility individual housing construction or garden house within the boundaries of a historical settlement of federal or regional significance;

3) the type of permitted use of a constructed or reconstructed capital construction project does not correspond to the type of permitted use of an individual housing construction project or garden house specified in the notice of planned construction;

4) the placement of an individual housing construction project or a garden house is not permitted in accordance with the restrictions established in accordance with the land and other legislation of the Russian Federation on the date of receipt of the notice of completion of construction, except in cases where these restrictions are provided for by the decision to establish or change the zone with special conditions for the use of the territory adopted in relation to the planned construction or reconstruction of a capital construction project, and such a capital construction project has not been put into operation. paragraph 1 of this article.

Filled out based on the information specified in the organization’s certificate,

authorized to carry out technical accounting

on the compliance of the parameters of the constructed, reconstructed

We confirm compliance

___________________________________________________________________________

___________________________________________________________________________

(name of the object, the address of the capital construction object is indicated in accordance with the construction permit, and if available - the address of the capital construction object in accordance with the state address register indicating the details of documents on assignment, on change of address; for linear objects - an address consisting of names of the subject of the Russian Federation and municipal formation)

___________________________________________________________________________

___________________________________________________________________________

Project documentation approved by the developer / technical customer -

__________________________________________________________________________,

(by whom and when approved, number of the examination report)

including energy efficiency requirements and requirements

equipped with metering devices for used energy resources.

Information about the capital construction project, linear facility to the extent necessary for state cadastral registration, as well as the specified information in accordance with the project documentation.

Indicator name

Unit

According to the project

Actually

1. General indicators of the facility being commissioned

Construction volume – total

including the above-ground part

total area

Area of ​​non-residential premises

Area of ​​built-in and attached premises

Number of buildings, structures

2. Non-production facilities

2.1. Non-residential objects
(facilities of healthcare, education, culture, recreation, sports, etc.)

Number of seats

Number of premises

Capacity

Number of floors

including underground

Escalators

Wheelchair lifts

Wheelchair lifts

Foundation materials

Wall materials

Floor materials

Other indicators

2.2. Housing facilities

Total area of ​​residential premises (excluding balconies, loggias, verandas and terraces)

The total area of ​​non-residential premises, including the area of ​​common property in an apartment building

Number of floors

including underground

Number of sections

Number of apartments/total area, total

including:

1-room

2-room apartments

3-room apartments

4-room apartments

more than 4 rooms

Total area of ​​residential premises (including balconies, loggias, verandas and terraces)

Networks and engineering support systems

Escalators

Wheelchair lifts

Foundation materials

Wall materials

Floor materials

Roofing materials

Other indicators

3. Industrial facilities

Name of the capital construction project in accordance with the design documentation:

Object type

Power

Performance

Networks and engineering support systems

Escalators

Wheelchair lifts

Foundation materials

Wall materials

Floor materials

Roofing materials

Other indicators

4. Linear objects

Length

Power (throughput, cargo turnover, traffic intensity)

Diameters and number of pipelines, characteristics of pipe materials

Type (CL, VL, KVL), voltage level of power lines

List of structural elements that provide
safety impact

Other indicators

5. Compliance with energy efficiency and requirements
equipped with metering devices for used energy resources

Building energy efficiency class

Filling light openings

Head of developer

construction __________________________ ________ _______________

Head of General

(name of organization) (signature) (full name)

"__" _________________ 200_

The largest free information and reference system for online access to the complete collection of technical regulations of the Russian Federation. Huge database of technical standards ( more than 150 thousand documents) and a complete collection of national standards, authentic to the official Gosstandart database. GOSTRF.com is more than 1 Terabyte free technical information for all Internet users. All electronic copies of documents presented here may be distributed without any restrictions. Dissemination of information from this site on any other resources is encouraged. Every person has the right to unlimited access to these documents! Every person has the right to know the requirements set out in these regulations!

on the compliance of the constructed (reconstructed, repaired) capital construction facility with the requirements of technical regulations

"__" ____________ 200_

Customer _____________________________________ represented by ________________________________

Acting on the basis ________________,

General Contractor ____________________________ represented by ____________________________

Acting on the basis _______________,

With this certificate we confirm that the constructed (reconstructed, repaired) capital construction facility is __________________________

(select the one you need) (name

object in accordance with the approved design documentation)

located at: ___________________________________________________

(indicate the full address of the object indicating the subject

Russian Federation, administrative region, etc. and building address)

complies with the requirements of technical regulations.

2. Construction was carried out according to the project ____________________________________

(name of the body that approved the project, date)

conclusion of the state examination of design documentation _________________

date of conclusion, adjustments)

3. Seasonal work (if the deadline for their completion is postponed) for landscaping, installation of top coverings for access roads to buildings, sidewalks, utility, playgrounds and sports grounds, as well as finishing elements of building facades must be completed and handed over to the owner in the manner established by the standards within the following deadlines :

A document confirming the conformity of the constructed facility

Obtaining permission to put the facility into operation

Permission to commissioning of the facility is a document that certifies the completion of capital construction in full in accordance with the construction permit, the compliance of the constructed capital object with the urban planning plan of the land plot and design documentation.

In Moscow, in order to put a built (reconstructed) building into operation, the developer must contact the authority that issued the permit, i.e. to Mosgosstroynadzor with a corresponding application.

The following documents must be attached to this application:

Obtaining permission to commission is not required only if for the construction, reconstruction of capital construction projects, as well as their major repairs, it was not necessary to obtain a permit.

Article 55 of the Town Planning Code provides for a list of documents for obtaining permission to put into operation and for some points, namely clauses 5, 6, the question arose of what kind of documents these are and what their form is:

5) a document confirming the compliance of the constructed, reconstructed, repaired capital with the requirements of technical regulations and signed by the person carrying out;

6) a document confirming the compliance of the parameters of the constructed, reconstructed, repaired capital construction project with the design documentation and signed by the person carrying out the construction (the person carrying out the construction, and the developer or customer in the case of implementation, reconstruction, major repairs on the basis of a contract), except for cases of construction , reconstruction, major repairs of individual housing facilities;

Construction and Housing Inspection

According to the first document, permission to put a facility into operation is issued by the authority that issued the construction permit. This article establishes that in order to commission a completed facility, the developer applies to the authority that issued the construction permit with an application for a permit to put the facility into operation.

A package of documents is attached to the application, and the list of these documents is strictly limited and cannot be expanded at the request of the party accepting the documents for consideration.

A statement of conformity (CCO) is “a conclusion of a state construction supervision body (if state construction supervision is provided) on the compliance of a constructed or reconstructed capital construction project with the requirements of technical regulations and design documentation, including energy efficiency requirements and facility equipment requirements capital construction with metering devices for used energy resources, conclusion of state environmental control in cases provided for in part 7 of article 54 of this Code" (clause 9 of part 3 of article 55 of the Town Planning Code of the Russian Federation of the Russian Federation).

Town Planning Code of the Russian Federation, N 190-FZ, Article 55

1. A permit to put an object into operation is a document that certifies the completion of construction, reconstruction of capital construction in full in accordance with the permit for, design documentation, as well as the compliance of the constructed, reconstructed capital construction object with the requirements for construction, reconstruction of a capital object established on the date of issue of the land plot submitted for obtaining permission for the urban planning plan, the permitted use of the land plot or in the case of reconstruction of the linear territory planning project and the territory surveying project, as well as the restrictions established in accordance with the land and other legislation of the Russian Federation.

Transfer of a shared construction project

Definition. Commissioning permit is a document that certifies the completion, reconstruction, overhaul of a capital facility in full in accordance with the permit, compliance of the constructed, reconstructed, repaired capital facility with the urban planning plan of the land plot and design documentation (clause 1 of Art.

Certificate of compliance of the constructed, reconstructed, repaired capital construction facility with the requirements of technical regulations

Appendix No. 4 to the Administrative Regulations of the Administration of the Municipal Formation Serebryano-Prudsky Municipal District for the provision of municipal services "Issue of permission to commission a capital construction project"

What else to download on the topic “Municipality9raquo;:

  • We will draw up a high-quality legal document
  • We specialize in all areas of law
  • Ask a question and get an answer within 10 minutes

An assistant site for drawing up various contracts. Templates and forms. Everything is ready, all you have to do is insert your data in the editor and print. If you have a template that you would like to post here, please use the feedback.

A document confirming the conformity of the constructed and reconstructed

DEPARTMENT OF CONSTRUCTION AND ARCHITECTURE OF THE VLADIMIR REGION ADMINISTRATION

ABOUT THE FORM OF DOCUMENTS ATTACHED TO THE APPLICATION FOR ISSUANCE OF PERMISSION TO COMMISSION A FACILITY

(as amended by the orders of the Department of Construction and Architecture of the Administration of the Vladimir Region dated May 29, 2009 N 51-a, dated May 17, 2010 N 41-a, dated November 8, 2012 N 106/1)

In order to establish uniform requirements for the form of documents attached by the developer to the application for a permit to put a facility into operation in accordance with Article 55 of the Town Planning Code of the Russian Federation,

(clause 2.3 was introduced by order of the Department of Construction and Architecture of the Administration of the Vladimir Region dated May 29, 2009 N 51-a)

construction and architecture

Appendix No. 1. DOCUMENT on compliance of the parameters of the constructed, reconstructed, repaired capital construction facility with the requirements of the design documentation

to the department order

construction and architecture

administration of the Vladimir region

dated March 13, 2007 N 37

(as amended by the order of the Department of Construction and Architecture

administration of the Vladimir region dated May 17, 2010 N 41-a)

DOCUMENT on compliance of the parameters of the constructed, reconstructed, repaired capital construction facility with the requirements of the design documentation

Project documentation developed _____________________________________________

(name of the organization that conducted the state examination of the design

An example of a completed certificate of compliance of the constructed facility with the requirements of technical regulations and design documentation

Hello, friends! In the last article we looked at the principle of drawing up a certificate of completed construction of an object, and today we’ll talk about drawing up a certificate of compliance of a constructed or reconstructed capital construction project with the requirements of technical regulations (norms and rules).

This document is needed to obtain a commissioning permit. This is established in Part 3 of Art. 55 Civil Code of the Russian Federation.

It is usually drawn up in the form of a deed. Below is a sample of the completed version. You can also download the handicap certificate from the link, the certificate of conformity of parameters signed by the developer and the contractor.

Click on the picture to enlarge.

In addition to these two acts, it is also necessary to draw up an act on the compliance of the parameters of the constructed or reconstructed capital construction facility with the design documentation. This document is also needed to obtain a commissioning permit.

You may also be interested in:

Denis, if it’s not difficult, could you explain the asterisk at points 6 and 7?

1) Reading the explanation, I understand that these items are filled in for objects that do not require certificates of compliance (project and technical regulations). Moreover, these points (6 and 7) are exactly in the certificate of compliance (which is not required).

2) If we fill out the entire act (it is required), then should we skip points 6 and 7?

3) If the project is not subject to state examination, is a certificate of compliance with the project and technical regulations required? And if it is required, then why points 6 and 7 at all? For private houses built?

I figured it out myself, thanks for the site! A lot of useful information!

Greetings, Alexey. I'm glad you figured it out. Thank you for rating the site.

Question regarding the act on the compliance of the parameters of the constructed facility. The object is an apartment building with utility networks. In paragraph 3. Linear objects - all on-site networks are listed. What indicators fit into, for example, the power supply network - the length of the network or the length of the cable? According to the project, the length of the network is 180 m.p., the length of the cables is 180 * 4 = 720 m.p. The cadastral engineer prescribes that the actual length of the network is 720 m.p. (it does not specify the length of the cable or the length of the network). I think there will be problems in obtaining permission to enter the building?

reconstructed an apartment in the Moscow Ring Road with permission on MY OWN (no contractor). How then to draw up a certificate of completed construction of an object and a certificate of compliance of the reconstructed capital construction object with the requirements of technical regulations? Should I go to the BTI, housing office or somewhere else?

Appendix No. 3

ACT

on the compliance of the parameters of the constructed, reconstructed, repaired capital construction facility with the design documentation.

"__" _________ 200g.

1. Representatives of the developer

customer _______________________________

(organization, position, full name) lperson carrying out the construction (contractor)

(organization, position, full name)

2. Design documentation for construction has been developeddesign organization _______________

(name of design organization)
Construction was carried out according to the project _

(series, project code)

Approved ____________________________________________________________________________

(name of the body that approved the project, date)

3. Permission to construct the facility______________________________________

(number, date of issue)
4. Completed construction, reconstruction, major repairs
capital construction project _____________________________________________________

(Object name)

has the following indicators:


Indicator name

Unit

According to the project

actually

1. General indicators of the facility being commissioned

Construction volume - Total

including the above-ground part

total area

Area built-inattached premises

Number of floors

things

2. Non-residential objects

Non-production facilities (schools, hospitals,

kindergartens, objects of culture, sports, etc.)

Number of seats Number of visits Capacity

Other indicators

Industrial facilities

Power Performance Length

(other indicators)foundation materialswall materials floor materials roofing materials




Appendix No. 3

3. Housing construction projects

Total area of ​​residential premises (for except for balconies, loggias, verandas, terraces)

Number of floors

things

Number of sections

sections

Number of apartments

Total

Including:

1-room

2-room apartments

3-room apartments

4-room

more than 4 rooms

pieces/m²

pieces/m²

pieces/m²

pieces/m²

pieces/m²

pieces/m²

Total area of ​​residentialpremises (includingbalconies, loggias, verandas and terraces)

Foundation materials

Wall materials

Floor materials

Roofing materials

4. Construction cost

Construction cost

object - total

including

construction and installation

works

thousand rubles

thousand rubles

5. Additional information

Based on the information provided

parameters of the capital construction project_______________________________________________

(Object name)

comply with the approved design documentation.

Applications:

Developer representatives

Customer representatives

"____"____________20__

"____"____________20__

___________________________

___________________________

(signatures, full name)

M.P.

(signatures, full name)

M.P.

Representatives of the personcarrying out construction

"____"____________20__

___________________________

(signatures, full name)

M.P.




Appendix No. 4

ACT

on the compliance of the parameters of the constructed, reconstructed, repaired capital construction facility with the technical conditions for the operation of engineering support networks.

"__" _________ 200g.

(the developer, or attracted by the developer or customer on the basis

___________________________________________________________

(organization, position, full name)


this act of completed construction ________________________________________

_______________

(Object name)

2. Construction was carried out by a contractor who performed __________________

(specify type of work)

and its subcontractors________________________________________________________

(name of company)

fulfilled

(specify types of work)

design organizations____________________________________________________________ _________

_______________________________________________________

(number, date of issue)
___________________________________________

(project series)

approved by ______________________________________________________________

documentation

Title of the document

Date of preparation

Note

according to the acts.

Title of the document

Date of preparation

Note

8. Seasonal work (if the deadline for completion is postponed)sidewalks, utility, playgrounds and sports grounds, as well as finishing

Types of jobs

Unit

Scope of work

Deadline

Appendix No. 4

9. Additional information ___________________________________________________________

Based on the information provided

Capital construction project__________________________________________

(Object name)

rules).

Applications:

Representatives of the personcarrying out construction

(signatures, full name) m.p.

* - the item is filled in for capital construction projects that are notrequirements of paragraph 1 of Article 54 of the Town Planning Code of the Russian Federation, and in relation towhich do not require drawing up a conclusion on the conformity of the constructed, reconstructed, repaired capital construction facility documentation.


Appendix No. 2

ACT

on the compliance of the constructed, reconstructed, repairedcapital construction project requirements of technical regulations(norms and rules).

"__" _________ 200g.

1. Representative(s) of the person carrying out the construction
(the developer, or attracted by the developer or customer on the basis
agreement, an individual or legal entity that meets the requirements
legislation of the Russian Federation, imposed on persons
carrying out construction) _______________________________________________________

____________________________________________________________________________________________

(organization, position, full name)

Guided by the executive and production documentation, I compiled
this act of completed construction _________________________________________

____________________________________________________________________________________________

(Object name)

2. Construction was carried out by a contractor who performed_ _________________

__________________________________________________________________________________________ __

(specify type of work )
and its subcontractors organizations __________________________________________________

(name of company) fulfilled

(specify types of work)

3. Design documentation for construction has been developed
design organizations___________________ ________________ _________________________

(name of design organizations)

4. Construction permit__________ _______________________________________________________________

(number, date of issue)

5. Construction was carried out according to the project___________________ _______________

(project series)
approved _______________________________________________________________________

(name of the body that approved the project)

6*. The following production and executive work has been completed for the facility documentation

Title of the document

Date of preparation

Note

7*. The equipment installed at the site complies with the design andaccepted after individual tests and comprehensive testing according to the acts.

Title of the document

Date of preparation

Note

8. Seasonal work (if the deadline for their completion is postponed) according tolandscaping, installation of top coverings for access roads to buildings,sidewalks, utility, playgrounds and sports grounds, as well as finishingelements of building facades must be completed and handed over to the investor(to the user) in the manner prescribed by regulations within the following time frames:

Types of jobs

Unit

Scope of work

Deadline


carried out in accordance with the requirements of technical regulations (standards rules).

Applications:

Representatives,carrying out construction

* - the item is filled in for capital construction projects that are not are subject to state construction supervision in accordance withrequirements of paragraph 1 of Article 54 of the Town Planning Code of the Russian Federation, and in relation to which do not require drawing up a conclusion on the conformity of the constructed, reconstructed, repaired capital construction facility requirements of technical regulations (norms and rules) and design documentation.


ACT

acceptance of a capital construction project.

Customer representative_______________________________________________________________

_________________________________________________________________________________________

(organization, position, full name)

Representative of the person carrying out the construction (contractor) ___________________

________________________________________________________________________________________

Representative of the design organization_______________________________________________

___________________________________________________________________________

(organization position, full name)

Representative of the organization performing technical supervision _____________________

___________________________________________________________________________

(organization position, full name)

Representative of the organization providing architectural supervision____________________

__________________________________________________________________________________________

(organization position, full name)

Representative of the operating organization__________________________________________

__________________________________________________________________________________________

(organization position, full name)

have drawn up this Act in that_______________________________________________ ____

(name of contractor organization)

completed the full scope of construction, reconstruction,
major repairs of a capital construction project______________________

_____________________________________________________________________________________

(name of object, address)

according to the project______________________________________________________________

(name of the design organization, project code)
in accordance with the requirements of the contract contract ___________________________________

(number, date)

and passed it on, and____________________________________________________________

(name of customer organization)

accepted the specified object.

Operating organization_______________________________________________ ____


Applications:

Developer representatives

Customer representatives

"____"____________20__

"____"____________20__

___________________________

___________________________

(signatures, full name)

M.P.

(signatures, full name)

M.P.

Representatives of the personcarrying out construction (contractor)

Representative of the design organization

"____"____________20__

"____"____________20__

___________________________

___________________________

(signatures, full name)

M.P.

(signatures, full name)

M.P.

Technical Supervision

"____"____________20__

"____"____________20__

___________________________

___________________________

(signatures, full name)

M.P.

(signatures, full name)

M.P.

Operating organization

"____"____________20__

___________________________

(signatures, full name)

M.P.