On approval of the standards of the warranty passport for the facility accepted for operation and instructions for the technical operation of buildings and structures. On the introduction of warranty certificates for completed construction, reconstruction, major repairs and

ORDER

On the introduction of warranty passports for completed
construction, reconstruction, overhaul and renovation
highways and artificial structures on them


In order to improve the acceptance into operation of federal highways and artificial structures on them, to increase the responsibility of contractors for the technology and quality of work performed:

1. To put into effect and recommend for use from June 1, 2003 warranty certificates for completed construction, reconstruction, major repairs and repairs of roads and artificial structures on them in accordance with Appendices 1 and 2 to this order.

2. Federal highway departments, highway departments, interregional directorates for road construction, directorates for the construction (reconstruction) of federal highways, when accepting into operation completed construction, reconstruction, major repairs and repairs of federal highways and artificial structures, apply warranty passports on them mentioned in paragraph 1 of this order.

3. To recommend to territorial road management bodies of the constituent entities of the Russian Federation the use of the forms of guarantee passports mentioned in paragraph 1 of this order.

4. Entrust control over the implementation of this order to the head of the Department of Highway Construction and Design Methodology N.P. Seregin.

First Deputy Minister
I.N.Slyunyaev

Appendix 1. Guarantee passport for major repairs, repairs) of a section of the road

Ministry of Transport of the Russian Federation

WARRANTY PASSPORT
for completed construction (reconstruction,
overhaul, repair) section of a highway

A section of a highway completed by construction (reconstruction, major repairs, repairs)

(full name of the highway, address of the launch complex)

CHARACTERISTIC

Length of section, km

Width of subgrade, m

Width of the roadway, m

Artificial structures:

Bridges, overpasses, tunnels, overpasses, pcs./rm

Culverts, pcs/rm

Road arrangement:

Signal posts, pcs.

Road signs, pcs/m

Warranty periods

Subgrade

Road base

Bottom layer of coating

Top coating layer

Artificial structures:

Bridges, overpasses, tunnels, overpasses

Culverts

Road arrangement:

Signal posts

Road signs




Signature

(Last name, I.O.)

Guarantee passport issued

(full name of the organization operating the facility, legal address, TIN)

(N of the government contract on the basis of which the organization operates the facility)

which undertakes to carry out work on time and in full

as well as buildings and structures of the road maintenance service.

(Head of operating organization)

Signature

(Last name, I.O.)

Appendix 2. Warranty passport for an artificial structure completed by construction (reconstruction, major repairs, repairs)

Ministry of Transport of the Russian Federation
STATE ROAD SERVICE

(full name of the road management body - customer)

WARRANTY PASSPORT
for completed construction (reconstruction,
overhaul, renovation) artificial structure

(full name of the facility, address of the launch complex, name of the highway)

(full name of the general contracting organization, legal address, TIN)

(N of the government contract on the basis of which this organization performed the work)

Completed construction (reconstruction, major renovation, renovation)

(full name of the facility, address of the launch complex, name of the highway)

accepted into operation by the state acceptance commission

(date of acceptance, day, month, year)

The work was carried out according to a project developed

(full name of the general design organization, legal address, TIN)

Engineering support of the project

(full name of the organization that provided engineering support, legal address, TIN)

CHARACTERISTIC
commissioned facility

Underbridge clearance, m

Width dimensions, m

Design loads

Longitudinal diagram

Longitudinal, ‰

Transverse, ‰

Support type

Type of spans

Type of expansion joints

Sidewalks, m

Railings (type, height), m

Type of regulatory structures

Strengthening cones, dams, m

approach length, m

width of the subgrade, m

width of the roadway, m

Type of coating (asphalt concrete, cement concrete, etc.)

Barrier fencing (metal, reinforced concrete, etc.), m

Signal posts, pcs.

Road signs, pcs/m

Buildings and structures of operational and motor transport services, pcs./m

Warranty periods

artificial structure

Regulatory structures (type of structure)

Approaches:

Subgrade

Road base

Bottom layer of coating

Top coating layer

Arrangement of approaches:

Barrier fencing (metal, reinforced concrete)

Signal posts

Road signs

Buildings and structures of operational and motor transport services

(full name of the general contractor)

assumes obligations to eliminate defects that arise during the warranty period.

If defects are detected in individual structural elements of structures within the warranty period, the warranty period for this element or part of the structure is established again in accordance with the State contract from the moment (date) of completion of work to eliminate the defect, documented by the relevant act. The duration of work to eliminate identified defects does not count towards the warranty period.

The Contractor bears property responsibility for the quality and volume of work performed, the terms stipulated by the State Contract and this Guarantee Passport.

(Head of general contracting organization)

Signature

(Last name, I.O.)

The text of the document is verified according to:
"Collection of guidance documents
state road service
economy (Rosavtodor) and federal
government bodies of sectoral importance",
N 2, 2003

ORDER
dated May 7, 2003 N IS-414-r

ON THE INTRODUCTION OF WARRANTY CARDS FOR COMPLETED CONSTRUCTION, RECONSTRUCTION, MAIN REPAIRS AND REPAIRS OF HIGHWAYS AND ARTIFICIAL STRUCTURES ON THEM

In order to improve the acceptance into operation of federal highways and artificial structures on them, to increase the responsibility of contractors for the technology and quality of work performed:

1. To put into effect and recommend for use from June 1, 2003 warranty certificates for completed construction, reconstruction, major repairs and repairs of roads and artificial structures on them in accordance with Appendices 1 and 2 to this order.

2. Federal highway departments, highway departments, interregional directorates for road construction, directorates for the construction (reconstruction) of federal highways, when accepting into operation completed construction, reconstruction, major repairs and repairs of federal highways and artificial structures, apply warranty passports on them mentioned in paragraph 1 of this order.

3. To recommend to territorial road management bodies of the constituent entities of the Russian Federation the use of the forms of guarantee passports mentioned in paragraph 1 of this order.

4. Entrust control over the implementation of this order to the head of the Department of Highway Construction and Design Methodology N.P. Seregin.

First Deputy Minister
I.N.SLYUNYAEV

Appendix 1
at your disposal
Ministry of Transport of Russia
dated May 7, 2003 N IS-414-r

MINISTRY OF TRANSPORT OF THE RUSSIAN FEDERATION STATE ROAD MAINTENANCE SERVICE (ROSAVTODOR) _______________________________________________________ (full name of the road management body _______________________________________________________ - customer) WARRANTY PASSPORT for the completed construction (reconstruction, major overhaul, repair) section of the highway _______________________________________________________ (full name highway, ______________________________________________________________ address of the launch complex ) 200_ ___________________________________________________________________ (full name of the general contracting organization, ___________________________________________________________________ legal address, TIN) ___________________________________________________________________ (N of the government contract on the basis of which this ___________________________________________________________________ organization performed the work) Completed construction (reconstruction, overhaul, repair) section of the highway _________________ (full ___________________________________________________________________ name of the highway, ___________________________________________________________________ address of the launch complex) accepted for operation by the state acceptance commission ___________________________________ (date of acceptance, date, month, year) The work was carried out according to the project developed by ______________________ (full name ___________________________________________________________________ of the general design organization, ___________________________________________________________________ legal address, TIN) Engineering support of the project _________________________________ (full name of the organization ___________________________________________________________________ that provided engineering support, ___________________________________________________________________ legal address, Taxpayer Identification Number) CHARACTERISTICS of the commissioned facility

Road category
Length of section, km
Width of subgrade, m
Width of the roadway, m

cement concrete, etc.)
Artificial structures:
Bridges, overpasses, tunnels, overpasses, pcs/m
Culverts, pcs/l.m
Road arrangement:

reinforced concrete, etc.), m
Signal posts, pcs.
Road signs, pcs./sq. m
Operational buildings and structures
and motor transport services, pcs./sq. m

WARRANTY PERIOD

Subgradefrom 8 years
Road basefrom 6 years
Bottom layer of coatingfrom 5 years
Top coating layerfrom 4 years
Artificial structures:
Bridges, overpasses, tunnels, overpassesfrom 8 years
Culvertsfrom 6 years
Regulatory buildings
(type of structure)
from 6 years
Road arrangement:
Barrier fencing
(metal, reinforced concrete)
from 5 years
Signal postsfrom 2 years
Road signsfrom 2 years

motor transport services
from 8 years

___________________________________________________________________ (full name of the general contractor) ___________________________________________________________________ ___________________________________________________________________ assumes obligations to eliminate defects that arise during the warranty period. If defects are detected in individual structural elements of structures within the warranty period, the warranty period for this element or part of the structure is established again in accordance with the State contract from the moment (date) of completion of work to eliminate the defect, documented by the relevant act. The duration of work to eliminate identified defects does not count towards the warranty period. The Contractor bears property responsibility for the quality and volume of work performed, the terms stipulated by the State Contract and this Guarantee Passport. _________________________ _________ ________________ (Head of the general Signature (Last Name) of the contracting organization) MP Guarantee passport issued by ________________________________________ (full name of the organization ___________________________________________________________________ operating the facility, ___________________________________________________________________ legal address, TIN) ___________________________________________________________________ (N of the government contract on the basis of which ___________________________________________________________________ the organization carries out operation of the facility) which undertakes to timely and fully carry out work on the maintenance of the ____________________ accepted for operation (name of the __________________________________________________________________ facility, address of the launch complex, name of the ___________________________________________________________________ highway) as well as buildings and structures of the road maintenance service. _____________________________ _________ ________________ (Head of the operating organization Signature (Last Name)) MP

Appendix 2
at your disposal
Ministry of Transport of Russia
dated May 7, 2003 N IS-414-r

MINISTRY OF TRANSPORT OF THE RUSSIAN FEDERATION STATE ROAD SERVICE (ROSAVTODOR) _____________________________________________________ (full name of the road management body _____________________________________________________ - customer) WARRANTY PASSPORT for an artificial structure completed by construction (reconstruction, major repairs, renovation) __________________________________________________________ (full name of the object , address of the launch complex, __________________________________________________________ name highway) 200_ ___________________________________________________________________ (full name of the general contracting organization, ___________________________________________________________________ legal address, TIN) ___________________________________________________________________ (N of the government contract on the basis of which this ___________________________________________________________________ organization performed the work) Completed construction (reconstruction, major repairs, repairs) ___________________________________________________ (full name of the object , ___________________________________________________________________ address of the launch complex, ___________________________________________________________________ name of the highway) accepted for operation by the state acceptance commission ___________________________________ (date of acceptance, day, month, year) The work was carried out according to the project developed by ______________________ (full name ___________________________________________________________________ of the general design organization, ___________________________________________________________________ legal address, TIN) Engineering project support _________________________________ (full name of the organization that provided engineering support, ___________________________________________________________________ legal address, Taxpayer Identification Number) CHARACTERISTICS of the commissioned facility

Length, m
Underbridge clearance, m
Width dimensions, m
Design loads
Longitudinal diagram
Slopes:
- longitudinal, ppm
- transverse, ppm
Support type
Type of spans
Type of expansion joints
Sidewalks, m
Railings (type, height), m
Type of regulatory structures
Strengthening cones, dams, sq. m
Approaches:
approach length, m
width of the subgrade, m
width of the roadway, m
Type of coating (asphalt concrete,
cement concrete, etc.)
Barrier fencing (metal,
reinforced concrete, etc.), m
Signal posts, pcs.
Road signs, pcs./sq. m
Buildings and structures for operational and
motor transport services, pcs./sq. m
Road basefrom 6 years Bottom layer of coatingfrom 5 years Top coating layerfrom 4 years Arrangement of approaches: Barrier fencing (metal,
reinforced concrete)from 5 years Signal postsfrom 2 years Road signsfrom 2 years Buildings and structures for operational and
motor transport servicesfrom 8 years

___________________________________________________________________ (full name of the general contractor) ___________________________________________________________________ ___________________________________________________________________ assumes obligations to eliminate defects that arise during the warranty period. If defects are detected in individual structural elements of structures within the warranty period, the warranty period for this element or part of the structure is established again in accordance with the State contract from the moment (date) of completion of work to eliminate the defect, documented by the relevant act. The duration of work to eliminate identified defects does not count towards the warranty period. The Contractor bears property responsibility for the quality and volume of work performed, the terms stipulated by the State Contract and this Guarantee Passport. _________________________ _________ ________________ (Head of the general Signature (Last Name) of the contracting organization) MP Guarantee passport issued by ________________________________________ (full name of the organization ___________________________________________________________________ operating the facility, legal address, TIN) ___________________________________________________________________ (N of the government contract on the basis of which the organization ___________________________________________________________________ carries out the operation facility) which undertakes to timely and fully carry out work on the maintenance of the ____________________ accepted into operation (name of the ___________________________________________________________________ object, address of the launch complex, name of the ___________________________________________________________________ highway) as well as buildings and structures of the road maintenance service. _____________________________ _________ ________________ (Head of the operating organization Signature (Last Name)) MP

font size

ORDER of the Ministry of Transport of the Russian Federation dated 05/07/2003 IS-414-r ON THE INTRODUCTION OF WARRANTY CARDS FOR COMPLETED CONSTRUCTION... Relevant in 2018

Appendix 2. WARRANTY PASSPORT FOR COMPLETED CONSTRUCTION (RECONSTRUCTION, OVERHAUL, RENOVATION) ARTIFICIAL STRUCTURE

MINISTRY OF TRANSPORT OF THE RUSSIAN FEDERATION STATE ROAD SERVICE (ROSAVTODOR) _____________________________________________________ (full name of the road management body _____________________________________________________ - customer) WARRANTY PASSPORT for an artificial structure completed by construction (reconstruction, major repairs, renovation) __________________________________________________________ (full name of the object , address of the launch complex, __________________________________________________________ name highway) 200_ ___________________________________________________________________ (full name of the general contracting organization, ___________________________________________________________________ legal address, TIN) ___________________________________________________________________ (N of the government contract on the basis of which this ___________________________________________________________________ organization performed the work) Completed construction (reconstruction, major repairs, repairs) ___________________________________________________ (full name of the object , ___________________________________________________________________ address of the launch complex, ___________________________________________________________________ name of the highway) accepted for operation by the state acceptance commission ___________________________________ (date of acceptance, day, month, year) The work was carried out according to the project developed by ______________________ (full name ___________________________________________________________________ of the general design organization, ___________________________________________________________________ legal address, TIN) Engineering project support _________________________________ (full name of the organization that provided engineering support, ___________________________________________________________________ legal address, Taxpayer Identification Number) CHARACTERISTICS of the commissioned facility

Length, m
Underbridge clearance, m
Width dimensions, m
Design loads
Longitudinal diagram
Slopes:
- longitudinal, ppm
- transverse, ppm
Support type
Type of spans
Type of expansion joints
Sidewalks, m
Railings (type, height), m
Type of regulatory structures
Strengthening cones, dams, sq. m
Approaches:
approach length, m
width of the subgrade, m
width of the roadway, m
Type of coating (asphalt concrete,
cement concrete, etc.)

reinforced concrete, etc.), m
Signal posts, pcs.
Road signs, pcs./sq. m

motor transport services, pcs./sq. m

WARRANTY PERIOD

artificial structurefrom 8 years
Regulatory structures (type of structure)from 6 years
Approaches:
Subgradefrom 8 years
Road basefrom 6 years
Bottom layer of coatingfrom 5 years
Top coating layerfrom 4 years
Arrangement of approaches:
Barrier fencing (metal,
reinforced concrete)
from 5 years
Signal postsfrom 2 years
Road signsfrom 2 years
Buildings and structures for operational and
motor transport services
from 8 years

___________________________________________________________________ (full name of the general contractor) ___________________________________________________________________ ___________________________________________________________________ assumes obligations to eliminate defects that arise during the warranty period. If defects are detected in individual structural elements of structures within the warranty period, the warranty period for this element or part of the structure is established again in accordance with the State contract from the moment (date) of completion of work to eliminate the defect, documented by the relevant act. The duration of work to eliminate identified defects does not count towards the warranty period. The Contractor bears property responsibility for the quality and volume of work performed, the terms stipulated by the State Contract and this Guarantee Passport. _________________________ _________ ________________ (Head of the general Signature (Last Name) of the contracting organization) MP Guarantee passport issued by ________________________________________ (full name of the organization ___________________________________________________________________ operating the facility, legal address, TIN) ___________________________________________________________________ (N of the government contract on the basis of which the organization ___________________________________________________________________ carries out the operation facility) which undertakes to timely and fully carry out work on the maintenance of the ____________________ accepted into operation (name of the ___________________________________________________________________ object, address of the launch complex, name of the ___________________________________________________________________ highway) as well as buildings and structures of the road maintenance service. _____________________________ _________ ________________ (Head of the operating organization Signature (Last Name)) MP

ADMINISTRATION OF THE CITY OF MAIKOP

RESOLUTION

On approval of the standards of the warranty passport for the facility accepted for operation and the Instructions for the technical operation of buildings and structures

In connection with the structural restructuring of the construction complex, the liquidation of departmental quality control services, and non-compliance with technological discipline in construction, trends towards a decrease in the quality of construction products have appeared.

In order to improve the quality of construction products, protect the rights and interests of consumers and increase the level of responsibility of design, contracting organizations and customer-developers to fulfill contractual obligations during the design, construction and subsequent operation of constructed facilities (buildings and structures), I decree:

1. Approve the standard warranty passport for the facility accepted for operation and the Instructions for the technical operation of buildings and structures (Appendices No. 1, No. 2) developed by the State Architectural and Construction Supervision Inspectorate of Maykop.

4. Control over the implementation of this resolution shall be entrusted to the inspection of the State Architectural and Construction Supervision Authority of the city of Maykop.

Head of the Maykop city administration
M.N.CHERNICHENKO

Appendix No. 1. Warranty passport for the facility accepted for operation

Appendix No. 1
to the resolution of the chapter
Administration of Maykop
dated October 28, 1997 N 1054


(OBJECT NAME)

_______________________________________

N _____ microdistrict ___________________ (quarter)

Is an attachment to the completed acceptance certificate

construction of the facility from ___________ 19 __

Maykop

This passport and instructions

cannot be fully or partially

reproduced, replicated

and distributed without permission

Inspectorate of State Architecture and Construction Supervision

Maykop

Basic provisions

The warranty passport was developed in accordance with the Civil Code of the Russian Federation, other regulations and is aimed at improving the quality of construction products, protecting consumer rights and increasing the responsibility of the contractor, customer and design organization to fulfill contractual obligations during the design, construction and subsequent operation of constructed buildings and structures.

The design organization guarantees the achievement of design technical and economic indicators, including ensuring the level of thermal protection and seismic resistance of buildings and structures.

The design organization and the contractor are responsible to the customer for any deviations from the requirements stipulated in the regulatory and technical documentation and in the building codes and rules binding on the parties, as well as for failure to achieve the indicators of the construction project specified in the technical documentation, including such as production capacity enterprises.

The organization operating buildings and structures must take over the completed construction facility within three days after approval of the acceptance committee act and ensure the occupancy of residential and public buildings no later than 15 days after acceptance into operation in order to avoid a decrease in the performance qualities of new buildings and structures.

The warranty period specified in the warranty passport begins to be calculated from the moment the object, completed construction, is handed over to the operating organization.

The quality guarantee of a constructed building or structure (facility) applies to all components, components and equipment.

Buildings and structures accepted for operation must be carefully inspected by the owners of buildings and structures on whose balance sheet they are located quarterly in the first two years of their operation and annually in subsequent years. At the same time, if hidden critical or significant defects in buildings and structures are revealed, according to GOST 15467-79, claims for them are made within the following terms:

a) Civil works

For critical defects leading to a decrease in stability and strength - regardless of the period of discovery, but not exceeding the standard service life of the structure or structure.

For critical defects leading to a decrease in reliability - within the standard period of technical operation of the building, structure, structure, unit, equipment.

For significant defects leading to a decrease in the operational characteristics of a building or structure - for 5 years, depending on the degree of capital (responsibility) of the building or structure.

b) Engineering support systems

For critical defects leading to a decrease in reliability - within the standard period of technical operation of the unit, structure, system.

For significant defects leading to a decrease in the operational characteristics of the structure - within 5 years.

c) Improvement

For critical defects leading to a decrease in strength and reliability - within the standard period of technical operation of elements and improvement structures.

For significant defects leading to a decrease in the performance characteristics of elements and improvement structures - within 5 years.

Construction ____________________________________________________

(name of the object, its address)

started ____

finished __

Design organization _____________________________________________________

(name, address)

Construction, installation and special works were carried out:

1. Civil works ________________________________________________

General contractor _____________________________________________________

__________

Contract (contract) ________________________________________________

(date, number)

(full name, telephone)

Work producer ______________________________________________

Masters __________________________________________________________

__________________________________________________________________

Special (subcontractors) participated in the construction of the facility

organizations.

2. Construction of external water supply networks.

(name of organization, address, telephone)

__________________________________________________________________

(date, number)

Supervisor _____________________________________________________

(full name, telephone)

Ch. engineer ______________________________________________________

(full name of the manager)

3. Construction of external sewerage networks.

Subcontractor _____________________________________________________

(name of organization, address, telephone)

__________________________________________________________________

Subcontract agreement ________________________________________________

(date, number)

Supervisor _____________________________________________________

(full name, telephone)

Ch. engineer ______________________________________________________

(full name of the manager)

4. Construction of external heat supply networks.

Subcontractor _____________________________________________________

(name of organization, address, telephone)

__________________________________________________________________

(date, number)

Supervisor _____________________________________________________

(full name, telephone)

Ch. engineer ______________________________________________________

(full name of the manager)

5. Construction of external gas supply networks.

Subcontractor _____________________________________________________

(name of organization, address, telephone)

__________________________________________________________________

Subcontractor agreement _____________________________________________________

(date, number)

Supervisor _____________________________________________________

(full name, telephone)

Ch. engineer ______________________________________________________

(full name of the manager)

6. Installation of external power supply networks.

Subcontractor _____________________________________________________

(name of organization, address, telephone)

__________________________________________________________________

Subcontractor agreement _____________________________________________________

(date, number)

Supervisor _____________________________________________________

(full name, telephone)

Ch. engineer ______________________________________________________

(Full name of technical manager)

7. Installation of an internal water supply system.

Subcontractor _____________________________________________________

(name of organization, address, telephone)

__________________________________________________________________

Subcontractor agreement _____________________________________________________

(date, number)

Supervisor _____________________________________________________

(full name, telephone)

Ch. engineer ______________________________________________________

(Full name of technical manager)

8. Construction of an internal sewerage system.

Subcontractor _____________________________________________________

(name of organization, address, telephone)

__________________________________________________________________

Subcontractor agreement _____________________________________________________

(date, number)

Supervisor _____________________________________________________

(full name, telephone)

Ch. engineer ______________________________________________________

(Full name of technical manager)

9. Construction of the internal heat supply system.

Subcontractor _____________________________________________________

(name of organization, address, telephone)

__________________________________________________________________

Subcontractor agreement _____________________________________________________

(date, number)

Supervisor _____________________________________________________

(full name, telephone)

Ch. engineer ______________________________________________________

(Full name of technical manager)

10. Construction of the internal gas supply system.

Subcontractor _____________________________________________________

(name of organization, address, telephone)

_________________________________________________________________

Subcontractor agreement _____________________________________________________

(date, number)

Supervisor _____________________________________________________

(full name, telephone)

Ch. engineer ______________________________________________________

(Full name of technical manager)

11. Construction of internal power supply networks.

Subcontractor _____________________________________________________

(name of organization, address, telephone)

__________________________________________________________________

Subcontractor agreement _____________________________________________________

(date, number)

Supervisor _____________________________________________________

(full name, telephone)

Ch. engineer ______________________________________________________

(Full name of technical manager)

12. Installation of operational equipment is completed.

Subcontractor _____________________________________________________

(name of organization, address, telephone)

__________________________________________________________________

Subcontractor agreement _____________________________________________________

(date, number)

Supervisor _____________________________________________________

(full name, telephone)

Ch. engineer ______________________________________________________

(Full name of technical manager)

13. Installation of boiler room equipment is completed.

Subcontractor _____________________________________________________

(name of organization, address, telephone)

_________________________________________________________________

Subcontractor agreement _____________________________________________________

(date, number)

Supervisor _____________________________________________________

(full name, telephone)

Ch. engineer ______________________________________________________

(Full name of technical manager)

14. Construction of low-current systems (telephone installation, radio installation).

Subcontractor _____________________________________________________

(name of organization, address, telephone)

__________________________________________________________________

Subcontractor agreement _____________________________________________________

(date, number)

Supervisor _____________________________________________________

(full name, telephone)

Ch. engineer ______________________________________________________

(Full name of technical manager)

15. Work on the construction of access roads, landscaping,

landscaping.

Subcontractor _____________________________________________________

(name of organization, address, telephone)

__________________________________________________________________

Subcontractor agreement _____________________________________________________

(date, number)

Supervisor _____________________________________________________

(full name, telephone)

Ch. engineer ______________________________________________________

(Full name of technical manager)

Completed construction project ___________________________________

(Name

__________________________________________________________________

put into operation ________________________________ 199 ____

State Commission

chaired by _____________________________________________________

__________________________________________________________________

The act of the state commission was approved by ________________________________________

__________________________________________________________________

document N, date

The materials, structures, products and equipment used meet the requirements of standards and technical specifications.

Claims for the elimination of defects arising during the operation of the facility for all types of work should be addressed to the organizations that performed the relevant work at the above addresses, or their legal successors.

If defects are identified for reasons dependent on design, survey, construction, installation and specialized subcontracting organizations, they will be eliminated either at their own expense free of charge, or compensation will be paid in the amount necessary for their immediate elimination, and, if necessary, for performing related work.

The contractor, subcontractor and design and survey organization are not responsible for defects if they occurred as a result of violation of technical operation rules and standard wear and tear of structural parts of buildings and structures, components, including engineering and technological equipment.

Project Manager

(full name, position)

______________________________________________________

(signature)

Head of General

construction organization ________________________________________

(full name, position)

_________________________________________

(signature)

Head of subcontractor

organizations ______________________________________________________________

(full name, position)

______________________________________________________

(signature)

Head of subcontractor

(full name, position)

_______________________________________________________

(signature)

Head of subcontractor

organizations _______________________________________________________________

(full name, position)

_______________________________________________________

(signature)

Head of subcontractor

organizations _______________________________________________________________

(full name, position)

_______________________________________________________

(signature)

Appendix No. 2. Instructions for technical operation of the facility

Appendix No. 2
to the resolution of the chapter
Administration of Maykop
dated October 28, 1997 N 1054

Department ______________________
Operational
organization ____________________
(name of organ,
________________________________
address, telephone)

INSTRUCTIONS FOR TECHNICAL OPERATION OF THE OBJECT

________________________________________________________
(NAME OF BUILDING AND STRUCTURE)

________________________________________________________

N _______ microdistrict ________________ (quarter)

is an attachment to the completed acceptance certificate

construction of the facility from _____________ 19 __

Maykop

Basic provisions

The municipal (territorial) system of use, maintenance and safety of buildings and structures provides for the performance by operating organizations of the following functions:

Organization of their use (registration, control, accounting, work with tenants);

Technical operation (sanitary maintenance of buildings and structures and the surrounding area, maintenance of structures, elements, components, engineering equipment of buildings);

Carrying out all types of repairs.

These instructions must be observed when operating buildings and structures, regardless of their departmental affiliation and form of ownership.

Operating organizations must ensure high-quality technical operation of buildings and structures, help prevent their premature wear and ensure compliance with specified operational indicators throughout the entire standard service life of the building, structures, equipment, and utility systems.

To do this you need to:

1) scheduled general inspections (buildings and structures are inspected as a whole, including structures, engineering equipment and external improvements);

2) scheduled private inspections (individual elements of a building or structure are inspected);

3) extraordinary inspections (carried out in the event of natural phenomena that cause damage to individual elements of buildings, as well as in the event of accidents or when identifying deformations of structures and malfunctions of engineering equipment that violate normal operating conditions.

The presence of defects requiring elimination is established by an act of the operating organization in accordance with the requirements reflected in the warranty passport.

Before carrying out work related to the reconstruction of buildings and structures, extensions, superstructures, redevelopment with dismantling of structures and utilities, functional changes in the purpose of premises, their owners (individuals and legal entities) must obtain permission from the Interdepartmental Commission of the Administration of Maykop in the presence of design documentation, developed and approved in accordance with the established procedure.

Operating organizations are responsible for timely inspection, proper operation and maintenance of buildings and structures.

If defects are detected that arise as a result of improper maintenance or operation of buildings and structures, they are eliminated by the operating organization at the expense of the persons who violated the procedure for operation or maintenance of buildings and structures, no later than three months from the date of their discovery.

In case of failure to eliminate defects within the specified time frame, operating organizations and their officials are held administratively liable in the manner prescribed by law.

Supervisor

operating organization _______________________

font size

ORDER of the Ministry of Transport of the Russian Federation dated 05/07/2003 IS-414-r ON THE INTRODUCTION OF WARRANTY CARDS FOR COMPLETED CONSTRUCTION... Relevant in 2018

Appendix 1. WARRANTY PASSPORT FOR COMPLETED CONSTRUCTION (RECONSTRUCTION, OVERHAUL, REPAIR) SECTION OF HIGHWAY

MINISTRY OF TRANSPORT OF THE RUSSIAN FEDERATION STATE ROAD MAINTENANCE SERVICE (ROSAVTODOR) _______________________________________________________ (full name of the road management body _______________________________________________________ - customer) WARRANTY PASSPORT for the completed construction (reconstruction, major overhaul, repair) section of the highway _______________________________________________________ (full name highway, ______________________________________________________________ address of the launch complex ) 200_ ___________________________________________________________________ (full name of the general contracting organization, ___________________________________________________________________ legal address, TIN) ___________________________________________________________________ (N of the government contract on the basis of which this ___________________________________________________________________ organization performed the work) Completed construction (reconstruction, overhaul, repair) section of the highway _________________ (full ___________________________________________________________________ name of the highway, ___________________________________________________________________ address of the launch complex) accepted for operation by the state acceptance commission ___________________________________ (date of acceptance, date, month, year) The work was carried out according to the project developed by ______________________ (full name ___________________________________________________________________ of the general design organization, ___________________________________________________________________ legal address, TIN) Engineering support of the project _________________________________ (full name of the organization ___________________________________________________________________ that provided engineering support, ___________________________________________________________________ legal address, Taxpayer Identification Number) CHARACTERISTICS of the commissioned facility

Road category
Length of section, km
Width of subgrade, m
Width of the roadway, m
Type of coating (asphalt concrete,
cement concrete, etc.)
Artificial structures:
Bridges, overpasses, tunnels, overpasses, pcs/m
Culverts, pcs/l.m
Road arrangement:
Barrier fencing (metal,
reinforced concrete, etc.), m
Signal posts, pcs.
Road signs, pcs./sq. m
Operational buildings and structures
and motor transport services, pcs./sq. m

WARRANTY PERIOD

Subgradefrom 8 years
Road basefrom 6 years
Bottom layer of coatingfrom 5 years
Top coating layerfrom 4 years
Artificial structures:
Bridges, overpasses, tunnels, overpassesfrom 8 years
Culvertsfrom 6 years
Regulatory buildings
(type of structure)
from 6 years
Road arrangement:
Barrier fencing
(metal, reinforced concrete)
from 5 years
Signal postsfrom 2 years
Road signsfrom 2 years
Buildings and structures for operational and
motor transport services
from 8 years

___________________________________________________________________ (full name of the general contractor) ___________________________________________________________________ ___________________________________________________________________ assumes obligations to eliminate defects that arise during the warranty period. If defects are detected in individual structural elements of structures within the warranty period, the warranty period for this element or part of the structure is established again in accordance with the State contract from the moment (date) of completion of work to eliminate the defect, documented by the relevant act. The duration of work to eliminate identified defects does not count towards the warranty period. The Contractor bears property responsibility for the quality and volume of work performed, the terms stipulated by the State Contract and this Guarantee Passport. _________________________ _________ ________________ (Head of the general Signature (Last Name) of the contracting organization) MP Guarantee passport issued by ________________________________________ (full name of the organization ___________________________________________________________________ operating the facility, ___________________________________________________________________ legal address, TIN) ___________________________________________________________________ (N of the government contract on the basis of which ___________________________________________________________________ the organization carries out operation of the facility) which undertakes to timely and fully carry out work on the maintenance of the ____________________ accepted for operation (name of the __________________________________________________________________ facility, address of the launch complex, name of the ___________________________________________________________________ highway) as well as buildings and structures of the road maintenance service. _____________________________ _________ ________________ (Head of the operating organization Signature (Last Name)) MP